Project, Subcontractor and Progress Payment System for TOKİ Projects
For contractors building public housing projects for TOKİ, Emlak Konut and similar clients: supervise, control and manage every process from tender to final acceptance in one system, covering schedule and progress, subcontractors and purchasing, concrete and rebar pours, payments with sequential approval, task allocation and project profitability, integrated with Mikro ERP.
Why it matters
Problems it solves
Who it's for: Contractors working with subcontractors across several sites on TOKİ, Emlak Konut, public and private projects; technical office, site, purchasing, finance and management teams
-
01
Whose desk is the payment waiting on?
Subcontractor payments travel by email from site to technical office to management; no one knows which approval they sit at or for how long, and the subcontractor calls every day.
-
02
Deductions and payment plans worked out by hand
Retention, advance recovery, shared costs and insurance contributions are recalculated in a spreadsheet for every payment, and the net amount and due dates do not add up.
-
03
Project profit only known at handover
Payments received from the client and money spent on subcontractors, materials and site are not seen together, so loss-making blocks or work items are only noticed when the project ends.
Modules
What it offers
-
Project lifecycle from tender to final acceptance
Project type, target budget and team (project manager, site chief, technical office, technical lead, finance); tender and contract, site handover, schedule, works and payments, provisional acceptance, maintenance period and final acceptance, each with owner, documents and dates.
-
Schedule and progress
Baseline and revised schedules with monthly and weekly plans; physical progress by block and work item, delay analysis and extension tracking.
-
Project profitability
Client payments and escalation income against subcontractor payments, materials, site and overhead costs. Gross profit, budget variance and forecast to completion by block and work item.
-
Site inspection and control
Works checklists, quality and H&S inspections, non-conformities and corrective actions; photo site reports linked to subcontractor and work item.
-
Process management and task allocation
Tasks are assigned to the project team and subcontractors with owner, due date, priority and status. Payment, purchasing and acceptance steps link to tasks, and overdue work and workload show per person.
-
Subcontractor management for TOKİ and Emlak Konut
Subcontractor packages tied to the client contract; allocation by block and work item, period comparison of client and subcontractor payments, and project profitability.
-
Subcontractor contracts
Contract value and currency, duration, payment review period, site handover and days left; retention and advance deduction rates, shared-cost and All Risk contributions, and delay penalty.
-
Payments and sequential approval
The payment file (PDF, Excel) is uploaded; site chief, technical lead, technical office, project manager and management approve in turn. Waiting days and rejection reasons are tracked.
-
Subcontractor portal
Subcontractors see their payments, approval stage, payment plan, account statement and the defects assigned to them, and upload payment files through the portal.
-
Management mobile summary
Pending approvals are approved with one tap or rejected with a reason from the phone, and critical alerts such as guarantee expiries, late payments and budget overruns arrive as notifications.
-
Payment plan
Net payable after deductions and advance recovery; instalments and weighted average maturity. Status moves from planned to invoiced, in payment and paid.
-
Guarantee letters
Performance and advance guarantees as letter or cheque; bank, amount, expiry and days left. Expiring and expired guarantees drop into the alert list.
-
Accounts, advances and penalties
Subcontractor and supplier statements with payment, invoice, payout, advance recovery, deduction and penalty movements; calculated, deducted and remaining penalties from days late and the daily rate.
-
Mikro ERP integration
Subcontractor and supplier accounts, projects and cost centres come from Mikro; approved payments, invoices, payouts, purchase orders and purchases are sent to Mikro.
-
Archive, dashboards and permissions
A standard project file archive from tender to permits; project and subcontractor dashboards and critical alerts; permissions by role and action, activity logs, Excel and PDF export.
-
Site and office purchasing
Purchase requests from site and office go to approval with project, budget and urgency, and approved requests become orders. Rebar and concrete deliveries are received with delivery note and plate number; supplier contracts pay in advance, at 30-45-60 days or month end.
-
Quotes and comparison
Quotes are collected from suppliers and subcontractors and compared side by side on price, payment terms, lead time and conditions. The chosen quote becomes an order or contract, and revisions are kept.
-
On-site concrete and rebar
Concrete pours (m³, class, delivery note, pump) and rebar (diameter, tonnes) by block, floor and element; actual is compared with the design quantity, waste and overuse show up, and the figures link to subcontractor payments and supplier invoices.
-
Provisional and final acceptance
Acceptance application, committee and date; defect list and close-out tracking, acceptance certificates. The period from provisional to final acceptance is tracked, and guarantee release and retention payback are tied to acceptance.
-
Quantities from the BIM model
Concrete, formwork and rebar quantities are taken from the IFC model by block, floor and element and used as the design quantity in pour and payment checks.
Screens
Inside the application
Switch between tabs to see the main screens. In a live demo we walk through a scenario close to your own data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
| Project | Type | Target budget | Contracts | Alert |
|---|---|---|---|---|
| Sample Hospital Campus | Hospital | ₺410.000.000 | 6 | Guarantee expiry |
| Harbour Logistics Warehouse | Logistics | ₺160.000.000 | 4 | Awaiting approval |
| Park Residences | Housing | ₺185.000.000 | 8 | Delay penalty |
| North Sports Complex | Sports hall | ₺720.000.000 | 10 | On track |
| Aegean Factory Building | Factory | ₺92.000.000 | 5 | Late payment |
| Ring Road Phase 2 | Road | ₺156.000.000 | 3 | On track |
| Water Main | Infrastructure | ₺38.000.000 | 2 | Completed |
| Cold Storage Facility | Factory | ₺54.000.000 | 4 | On track |
Active projects, contract and payment totals, budget realisation and critical alerts.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
| Item | Budget | Actual | Forecast | Variance |
|---|---|---|---|---|
| Client payments | ₺185,0 Mn | ₺88,9 Mn | ₺185,0 Mn | — |
| Escalation income | ₺14,0 Mn | ₺7,5 Mn | ₺16,2 Mn | +15.7% |
| Structural subcontractor | ₺62,0 Mn | ₺31,4 Mn | ₺64,1 Mn | +3.4% |
| Concrete and rebar | ₺41,5 Mn | ₺22,8 Mn | ₺44,9 Mn | +8.2% |
| Finishes and MEP | ₺38,0 Mn | ₺14,2 Mn | ₺37,1 Mn | −2.4% |
| Site and overhead | ₺18,5 Mn | ₺9,6 Mn | ₺19,0 Mn | +2.7% |
| Delay penalty deductions | — | −₺0,8 Mn | −₺1,2 Mn | Income |
| Project gross profit | ₺39,0 Mn | ₺15,2 Mn | ₺37,3 Mn | 18.5% → 18.5% |
Client payments and escalation income against subcontractor, material and other costs; gross profit by block and forecast to completion.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
- Physical progress
- 48%
- Time used
- 52%
- Open tasks
- 27
Each stage has an owner, documents and dates; an unfinished stage locks the next one.
- Tender and contractContract, guarantee, insurance · project managerDone
- Site handoverHandover certificate · site chiefDone
- ScheduleRevision 2 approved · technical officeDone
- 4Works and paymentsPayment 9 · structure 71%, finishes 22%In progress
- 5Provisional acceptancePlanned · Q3 2027Waiting
- 6Final acceptanceAfter maintenance period · guarantee releaseWaiting
Project stages with owner and status; delayed stages and open task counts.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
- Payment amount
- ₺8.035.647,73
- Submitted
- 31.08.2026
- Files
- PDF + Excel
Approval flow: site chief → technical lead → technical office → project manager → management
- Site chiefQuantity and works checkApproved
- Technical leadTechnical complianceApproved
- Technical officeUnit prices and summaryApproved
- Project managerBudget and contract checkApproved
- ManagementFinal approvalApproved
- 6Payment planNet ₺7,183,700 · 3 instalmentsPlanned
Payments with their files are approved in turn from site to management: who, when and how many days at each step.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
| Subcontractor | Contract value | Approved | Work left | Days left |
|---|---|---|---|---|
| Piling Inc. | ₺7.976.875 | ₺3.644.850 | 54.3% | 23 days over |
| Earthworks Co. | ₺10.124.449 | ₺8.035.648 | 20.6% | 41 days |
| Steel Structures Inc. | ₺75.000.000 | ₺0 | 100% | 77 days |
| Mechanical Ltd. | ₺46.500.000 | ₺0 | 100% | No handover |
| Facade Systems | ₺56.006.474 | ₺317.500 | 99.4% | 12 days |
| Structure Co. | ₺44.057.090 | ₺0 | 100% | No handover |
| Electrical Contracting | ₺9.284.785 | ₺0 | 100% | 12 days |
| Demolition Co. | ₺1.500.000 | ₺235.000 | 84.3% | 65 days |
Contract value, approved payments, remaining amount and work left; site handover and days left.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
| Payment | Amount | Net payable | Instalments | Status |
|---|---|---|---|---|
| HK-26-0008 | ₺8.035.648 | ₺7.183.700 | 0/3 | Planned |
| HK-26-0009 | ₺3.644.850 | ₺3.226.800 | 0/2 | Planned |
| HK-26-0006 | ₺345.000 | ₺300.150 | 0/3 | In payment |
| HK-26-0005 | ₺317.500 | ₺276.225 | — | Invoiced |
| HK-26-0003 | ₺342.500 | ₺297.975 | 2/2 | Paid |
| HK-26-0002 | ₺312.000 | ₺271.440 | 1/2 | In payment |
| HK-26-0001 | ₺305.000 | ₺265.350 | 2/2 | Paid |
| HK-25-0019 | ₺258.500 | ₺224.895 | 2/2 | Paid |
Net payable from the payment amount after deductions; advance, instalments, weighted average maturity and payment status.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
| Request | From | Material / service | Qty | Status |
|---|---|---|---|---|
| STL-26-0412 | Site · North Sports | C30/37 ready-mix | 180 m³ | Collecting quotes |
| STL-26-0410 | Site · Park Residences | Rebar Ø16 | 42 ton | Awaiting approval |
| STL-26-0408 | Office · HQ | Plotter ink and paper | 12 items | Ordered |
| STL-26-0405 | Site · Sample Hospital | Scaffolding hire | 1.200 m² | Comparing quotes |
| STL-26-0401 | Site · Harbour Depot | Site office container | 2 pcs | Received |
| STL-26-0398 | Site · North Sports | H&S equipment | 48 items | Partly received |
| STL-26-0394 | Office · HQ | Software licence | 5 users | Ordered |
| STL-26-0390 | Site · Park Residences | Formwork plywood | 640 m² | Rejected · budget |
Requests from site and office with project, budget and urgency; approval, quote, order and delivery status in one list.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
| Supplier | Unit price | Terms | Lead time | Assessment |
|---|---|---|---|---|
| Concrete Inc. | ₺2.380 | 60 days | Next day | Selected |
| Ready-Mix Ltd. | ₺2.345 | Cash | 2 days | Terms not suitable |
| Build Concrete | ₺2.410 | Month end + 60 | Next day | Alternative |
| Regional Concrete | ₺2.520 | 45 days | 3 days | Over budget |
| Pump | Included | Excluded · ₺18,000 | Included | Included |
| Admixture (waterproofing) | +₺85 | +₺70 | +₺90 | +₺95 |
| Revision | R2 | R1 | R1 | R1 |
| Next step | Order SAS-26-0233 → Mikro | — | — | — |
Supplier quotes for the same request side by side on price, payment terms, lead time and conditions; the chosen quote becomes an order.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
| Date | Movement | Debit | Credit | Balance |
|---|---|---|---|---|
| 10.07.2026 | Advance payment | ₺1.000.000 | — | ₺1.000.000 |
| 31.08.2026 | Payment HK-26-0008 | — | ₺8.035.648 | ₺7,035,648 Cr |
| 31.08.2026 | Retention 5% | ₺401.782 | — | ₺6,633,866 Cr |
| 31.08.2026 | Advance recovery | ₺1.000.000 | — | ₺5,633,866 Cr |
| 31.08.2026 | Shared-cost contribution | ₺160.713 | — | ₺5,473,153 Cr |
| 05.09.2026 | Invoice 2026-000184 | — | — | ₺5,473,153 Cr |
| 15.09.2026 | Payout · instalment 1/3 | ₺2.394.567 | — | ₺3,078,586 Cr |
| 15.10.2026 | Payout · instalment 2/3 | ₺989.837 | — | ₺2,088,749 Cr |
Payment, invoice, advance, deduction, penalty and payout movements per subcontractor, with the balance matching Mikro.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
| Element | Class / dia. | Design | Actual | Variance |
|---|---|---|---|---|
| Block B · floor 5 slab | C30/37 | 142,0 m³ | 145,5 m³ | +2.5% |
| Block B · floor 5 columns | C30/37 | 38,4 m³ | 38,9 m³ | +1.3% |
| Block B · floor 5 walls | C30/37 | 64,2 m³ | 68,7 m³ | +7.0% |
| Block B · floor 5 slab | Ø12 | 9,84 t | 10,02 t | +1.8% |
| Block B · floor 5 columns | Ø20 | 6,12 t | 6,20 t | +1.3% |
| Block B · floor 6 slab | C30/37 | 142,0 m³ | Planned | Pump 12.10 |
| Block A · raft | C35/45 | 612,0 m³ | 618,4 m³ | +1.0% |
| Into payment | Structure Co. | — | 252,1 m³ | HK-26-0011 |
Pours by block, floor and element; design and actual quantities, variance, delivery note and subcontractor.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
- Completion
- 30.07.2027
- Defects
- 38 / 34 closed
- Guarantee
- Released at final
The period and maintenance obligation from provisional to final acceptance are tracked.
- Acceptance applicationLetter to client and completion reportDone
- Acceptance committeeSite inspection · 38 defectsDone
- 3Defect close-out34/38 closed per subcontractorIn progress
- 4Provisional acceptance certificateSigned and archivedWaiting
- 5Maintenance periodTracked from provisional acceptanceWaiting
- 6Final acceptance and guarantee releaseRelease of retention and guaranteesWaiting
Every step from acceptance application to final acceptance; defect list, certificates and guarantee release.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
| Task | Owner | Due | Linked to | Status |
|---|---|---|---|---|
| Review payment HK-26-0011 | Technical office | 14.10.2026 | Payment | In progress |
| Floor 6 slab concrete order | Site chief | 11.10.2026 | Purchasing | Today |
| Facade subcontractor bid review | Project manager | 18.10.2026 | Quote | Waiting |
| Renew guarantee letter | Finance | 08.10.2026 | Guarantee | Late · 1 day |
| Defect list · ground floor | Mechanical Ltd. | 15.09.2027 | Acceptance | Planned |
| Monthly schedule revision | Technical lead | 20.10.2026 | Files | Waiting |
| Rebar delivery reconciliation | Purchasing | 12.10.2026 | Purchase | In progress |
| Weekly H&S inspection | Site engineer | 10.10.2026 | Site | Done |
Tasks assigned to the project team and subcontractors with owner, due date, priority and status.
Representative screen prepared with sample data.
- Dashboard
- Projects
- Contracts
- Payments
- Purchasing
- Accounts
- Guarantees
- Files
| Subcontractor | Type | Amount | Expiry | Left |
|---|---|---|---|---|
| Earthworks Co. | Performance · letter | ₺10.000.000 | 27.08.2027 | 322 days |
| Earthworks Co. | Performance · cheque | ₺1.012.444 | 31.08.2027 | 326 days |
| Architecture Studio | Advance · letter | ₺215.500 | 28.10.2026 | 19 days |
| Concrete Co. | Performance · letter | ₺106.000 | 08.10.2026 | 1 day over |
| H&S Consulting | Advance · letter | ₺208.500 | 18.09.2026 | 21 days over |
| Piling Inc. | Advance · letter | ₺58.500 | 21.01.2026 | 261 days over |
| Facade Systems | Performance · letter | ₺56.000 | 01.05.2027 | 204 days |
| Steel Structures Inc. | Performance · letter | ₺3.750.000 | 01.11.2027 | 388 days |
Performance and advance guarantees with bank, amount and expiry; expiring and expired ones flagged.
Representative screen prepared with sample data.
How it works
The process step by step
-
01
Tender and contract
Client contract, budget, project team and task allocation are set up.
-
02
Site handover and schedule
Site handover starts the clock, and the schedule is split by block and work item.
-
03
Subcontractors and purchasing
Quotes are compared and subcontractor contracts and material orders are opened.
-
04
Works, pours and payments
Concrete and rebar pours, site inspections and payments with sequential approval; profitability updates every period.
-
05
Provisional acceptance
Defects are assigned to subcontractors as tasks and acceptance is recorded with a certificate.
-
06
Final acceptance and close-out
Final acceptance after the maintenance period; guarantees are released and the project closes with its final profit and loss.
Use cases
Use by project type
The same structure works across clients and project types, with their own stages and control rules.
-
TOKİ and Emlak Konut housing
Subcontractor packages by block and unit type, concrete and rebar pours, client versus subcontractor payments, provisional and final acceptance.
-
Hospitals and public buildings
Heavy MEP packages, material approvals, quality and H&S inspections, client correspondence and extension files.
-
Roads and infrastructure
Progress by kilometre and section, excavation and fill subcontractors, machinery costs and payments by phase.
-
Private factories and warehouses
Foreign-currency contracts, steel and facade subcontractors, client-approved payments and fast-track schedules.
Who it's for
Something for every role
-
Management
Run every project from one screen
- Profitability and budget variance per project
- Pending approvals and critical alerts on the phone
- Cash out and guarantee risk seen in advance
-
Project manager
Every stage under control, tender to acceptance
- Schedule and physical progress
- Subcontractor contracts and work left
- Task allocation and overdue work
-
Site chief
Record every job on site
- Concrete and rebar pours, site inspections
- Purchase requests from site
- First payment approval and defect tracking
-
Technical office
Payment checks in one place
- Payment files and approval history
- Design versus actual quantities
- Quote comparison and contract deductions
-
Finance
Payments and accounts without errors
- Net payment plan and maturity after deductions
- Guarantee letter expiry alerts
- Account balances matching Mikro
-
Subcontractor
See where my payment is without asking
- Approval stage and payment plan in the portal
- Account statement and deductions
- Defects assigned to them
Before and after
Spreadsheets and email versus Nitrogen
What you measure: payment approval time, payment delays and when a profit variance is spotted.
| Topic | Spreadsheets and email | Nitrogen |
|---|---|---|
| Payment approval | Travels by email; no one knows where it waits | Sequential approval; each step with date and duration |
| Deductions and net payable | Recalculated in a spreadsheet every period | Automatic from contract rates |
| Payment schedule | In finance's personal list | Plan with instalments and weighted average maturity |
| Guarantee expiry | Noticed after it expires | Alert 15 days ahead |
| Concrete and rebar | Delivery notes in binders; variance at month end | Design versus actual per pour, variance at once |
| Project profitability | Known when the project ends | Every payment period, by block and item |
| Acceptance | Defect list in Excel, owners unclear | Defects assigned to subcontractors as tasks with due dates |
| Subcontractor communication | Status asked by phone every day | Subcontractor checks in the portal |
Rollout
Going live step by step
Start with your current projects and run your payment periods in the system from the first one. Timing is planned in discovery based on project and subcontractor numbers.
-
Step 1
Data import
Projects, subcontractor and supplier accounts, contracts and guarantees are imported from Excel and Mikro.
-
Step 2
Roles and approval flow
Project teams, permissions, approval order and deduction rates are set up.
-
Step 3
Training and pilot project
Role-based training for site, technical office and finance; a live payment on one project.
-
Step 4
Live on all projects
Remaining projects go live, with the subcontractor portal and management mobile summary.
PDF · 8 pagesBrochure
Nitrogen Hakediş product catalogue
The problems contractors face, the project lifecycle from tender to final acceptance, payment calculation and sequential approval, project profitability, Mikro ERP integration and rollout steps.
Integrations
Works with
- Mikro ERP: accounts, projects and cost centres; transfer of payments, invoices, payouts and purchasing
- Same flow as Nitrogen purchase request and approval management
- Excel and PDF list exports
- Project archive for payment, contract and guarantee files
Related article
How to digitise progress payments on TOKİ projects
When subcontractor payments travel by email, deductions live in spreadsheets and guarantee expiries depend on memory, every period brings the same problems. The steps to run payments in one flow from contract to payout.