Nitrogen UTS · Detailed tour
Every step of production, visible with Nitrogen UTS
All Nitrogen UTS modules, the shop-floor flow and rollout steps, from planning and operator entry to set and station routes, plant dashboards, subcontracting and costing.
- Integrated with Mikro Jump & Fly
- Set and station routes
- BOM, batch and project
- Kiosk, tablet, handheld
- Live plant dashboard
Sound familiar?
Which problems does Nitrogen UTS solve?
The sentences we hear most often in the field, and the answer to each.
-
“We only learn where an order stands when we walk the floor.”
With Nitrogen UTS
Live work-order tracking
Each work order's operation, machine and completion rate is on screen, with delays listed separately.
-
“Production is written on paper and keyed into Mikro at night.”
With Nitrogen UTS
Instant entry from the floor
Operators enter output, consumption and scrap at their station, posted to Mikro at the same time.
-
“We don't know why a machine stopped or for how long.”
With Nitrogen UTS
Downtime and efficiency records
Downtime is logged with a reason and efficiency is reported per machine and operation.
-
“We don't know what a product really costs us.”
With Nitrogen UTS
Pre-cost versus actual cost
The pre-cost in the bill of materials is compared with actual consumption stage by stage.
Step by step
The process end to end with Nitrogen UTS
-
01
Work order
The order comes from Mikro; the work order is created in UTS or taken from Mikro.
-
02
Planning
The work order is sequenced to a line, machine or subcontractor by capacity.
-
03
Material issue
Materials are issued from the warehouse to production, by barcode with Nitrogen PDA.
-
04
Operator entry
The operator starts the job; output, consumption, downtime and scrap are entered at the station.
-
05
Quality check
Finished goods are checked with Nitrogen QMS forms; the result drives shipping.
-
06
Completion and costing
Output and cost data are posted to Mikro and the work order closes.
Who it's for
Something for every role
-
Owner / general manager
See the plant from the office
- Live status by machine and operation
- Delay and downtime reports
- Pre-cost versus actual cost
-
Production planner
Plan by capacity
- Line, machine and subcontractor load
- Reservations and sequencing
- Revisions reach the floor instantly
-
Operator
One screen instead of paper
- Start, stop, output, scrap
- Automatic quantity from scales
- Barcode label printing
-
Accounting and costing
Costs without waiting for month end
- Consumption and output in Mikro instantly
- Stage-based costing
- Actual cost integrated into accounting
Modules
Nitrogen UTS modules
Planning 4
- Pre-costing and BOMSet pre-costs in price and currency, and create BOMs and technical instructions.
- Production planningProduct-to-workshop plans, subcontractor and line load, actuals tracking.
- Work order and routingDefine and authorise processes, and manage revisions and delays.
- Customer order managementTrack different loading requests in one order and prepare work orders separately or combined.
Shop floor 3
- Barcode production trackingInstant data capture at subcontractors and on lines, department tracking by barcode.
- Operational efficiencyModel operation lists from time studies, efficiency tracking.
- Barcode cartons and loadingTrack export loads by barcode and create quality and packing lists.
Route and station tracking 6
- Routes by set and lineOrder lines are grouped into sets; which station each set has finished, is in and is waiting for is tracked.
- Rule-based station queueOnly jobs whose earlier steps are complete reach the station queue; operators start, finish and print labels.
- Production dashboardTotal, started, in-production, completed, past-due and blocked orders and sets by plant and station.
- Bottlenecks and watch listWaiting work and average and longest wait per station; past-due, blocked and quality-issue sets in one list.
- Staff assignmentAssign orders to teams or staff at stations such as assembly, with assigned and unassigned work kept apart.
- Quality issues, blocking and shippingLog quality issues and block a set from the station; once all sets are done, the order drops into the ready-to-ship list.
Materials, quality and costing 6
- Material requirements (MRP)Source materials just in time and reduce idle stock cost.
- Purchasing and materialsLot or shelf-level tracking; barcode lot management on mobile.
- Raw material QCChecks integrated with fabric rolling machines, with defect maps.
- Finished goods QCSchedule inspections on the web, enter results and measure supplier performance.
- Cost managementAnalyse pre-cost against actual cost stage by stage.
- Cost accountingPost actual costs to accounting; profitability and statements update automatically.
Floor screens
Floor screens from order to shipping
From planning to the operator kiosk, from quality control to traceability and actual cost: the key screens for every role in production.
- Dashboard
- Tracking
- Cutting
- Profile
- Assembly
- Packing
- Shipping
- Waiting
- 76
- In progress
- 3
- Waiting
- 190
- In progress
- 2
- Waiting
- 174
- In progress
- 6
- Waiting
- 72
- In progress
- 9
- Waiting
- 44
- In progress
- 5
- Waiting
- 68
- In progress
- 2
- Waiting
- 31
- In progress
- 3
- Waiting
- 104
- In progress
- 4
ManagerLive status by plant and station: progress, waiting work and bottlenecks.
You see where work is piling up before the shift ends, so action doesn't wait for the end of the day.
Representative screen prepared with sample data.
- Dashboard
- Planning
- Floor
- Quality
- Traceability
- Costing
- Mikro
PlannerWeekly load by line and station; jobs are rescheduled by dragging, and overloaded lines show in advance.
An overloaded line shows before a due date slips, and work is moved to another line or a subcontractor.
Representative screen prepared with sample data.
- Dashboard
- Tracking
- Cutting
- Profile
- Assembly
- Packing
- Shipping
- Cutting
- Profile
- Assembly
- Packing
- Cutting
- Profile
- Assembly
- Packing
- Cutting
- Profile
- Assembly
- Packing
- Cutting
- Profile
- Assembly
- Packing
Sales and planningRoute by order, set and line: which station each set has finished, on one screen.
When a customer asks, you can tell where each set of the order is without walking the floor.
Representative screen prepared with sample data.
- My job
- Queue
- Downtime
- Scrap
- Label
- Shift
- Shift target
- 2,400 pcs
- Good
- 1.446
- Scrap
- 18 · 1.2%
- Downtime
- 35 min
- Cycle time
- 14.2 s
- OEE
- 81%
OperatorOn a large touch screen the operator starts, pauses and finishes the job, and records scrap and downtime reasons with one tap.
Output, scrap and downtime are recorded as they happen; no estimated forms at the end of the day.
Representative screen prepared with sample data.
- Dashboard
- Tracking
- Cutting
- Profile
- Assembly
- Packing
- Shipping
| Order | Account | Progress | Due | Status |
|---|---|---|---|---|
| SP-26-4790 | Sample Interiors | 0/14 | 02.10.2026 | 6 days late |
| SP-26-4798 | North Home Textiles | 0/4 | 09.10.2026 | Today |
| SP-26-4803 | Harbour Hotel | 5/17 | 12.10.2026 | In progress |
| SP-26-4811 | Park Residences | 0/3 | 13.10.2026 | Queued |
| SP-26-4814 | Aegean Decor | 0/6 | 14.10.2026 | Queued |
| SP-26-4817 | Star Build | 2/12 | 14.10.2026 | In progress |
| SP-26-4819 | Blue Architects | 0/2 | 15.10.2026 | Queued |
| SP-26-4821 | Sample Interiors | 3/4 | 15.10.2026 | In progress |
| SP-26-4824 | City Homes | 0/8 | 16.10.2026 | Waiting for fabric |
| SP-26-4826 | Park Residences | 0/9 | 16.10.2026 | Queued |
Operator and supervisorOperators only see jobs whose earlier steps are done; they start them, print labels and report issues.
Work whose previous step isn't done never reaches the station, so missing parts don't surface at shipping.
Representative screen prepared with sample data.
- Dashboard
- Planning
- Floor
- Quality
- Traceability
- Costing
- Mikro
| Check | Target | Limit | Measured | Result |
|---|---|---|---|---|
| Viscosity | 110 KU | 105–115 | 112 KU | Pass |
| Density | 1.42 g/ml | ±0.02 | 1.43 g/ml | Pass |
| pH | 8.5 | 8.0–9.0 | 8.7 | Pass |
| Colour difference (ΔE) | 0 | ≤ 1.0 | 1.4 | Out of limit |
| Hiding power | 98% | ≥ 97% | 98.4% | Pass |
| Drying time | 2 h | ≤ 2.5 h | 1.8 h | Pass |
| Gloss 60° | 10 GU | 8–12 | 9.6 GU | Pass |
| Packaging and label | — | — | Checked | Pass |
| Decision | — | — | Colour correction | Batch blocked |
QualityThe inspection form opens at the station; size, colour and viscosity are checked against limits and a non-conforming batch is blocked.
An out-of-limit batch is blocked before it ships, and decisions and measurements are ready for audits.
Representative screen prepared with sample data.
- Overview
- Mikro orders
- BOMs
- Production orders
- Floor entry
- Mikro transfer
| Component | Formula | Qty | Unit | Stock |
|---|---|---|---|---|
| Blackout fabric 204 | width × height × 1.05 | 4,54 | m² | In stock |
| Tube Ø38 | width − 3 cm | 1,77 | m | In stock |
| Bottom rail | width − 2 cm | 1,78 | m | In stock |
| Chain mechanism | fixed | 1 | set | Short · 0 |
| Plastic chain | height × 2 × 0.8 | 3,84 | m | In stock |
| End cap set | fixed | 1 | set | In stock |
| Mounting bracket | width > 150 ? 3 : 2 | 3 | pcs | In stock |
| Bottom rail cap | fixed | 2 | pcs | Low · 14 |
| Product label | fixed | 1 | pcs | In stock |
| Carton 200 cm | fixed | 1 | pcs | In stock |
PlannerThe template BOM is calculated from the line's size; quantities and stock on one screen.
The right material need comes from the order's size without opening a BOM for every variant.
Representative screen prepared with sample data.
- Overview
- Mikro orders
- BOMs
- Production orders
- Floor entry
- Mikro transfer
| Raw material | Formula % | Target | Weighed | Lot / status |
|---|---|---|---|---|
| Titanium dioxide | %22,0 | 264,0 kg | 264,2 kg | L-0914 · Done |
| Acrylic binder | %35,5 | 426,0 kg | 425,6 kg | L-0877 · Done |
| Calcite filler | %18,0 | 216,0 kg | 156,4 kg | L-0931 · Weighing |
| Additive pack | %2,5 | 30,0 kg | — | No lot selected |
| Water | %19,4 | 232,8 kg | — | Queued |
| Dispersant | %0,8 | 9,6 kg | 9,6 kg | L-0902 · Done |
| Defoamer | %0,3 | 3,6 kg | 3,6 kg | L-0888 · Done |
| Thickener | %1,2 | 14,4 kg | — | Queued |
| Preservative (biocide) | %0,3 | 3,6 kg | — | Queued |
OperatorThe order-specific formula becomes a batch; every raw material is weighed and consumed with its lot number.
Every raw material is weighed and consumed with its lot, and deviation from the formula shows at weighing.
Representative screen prepared with sample data.
- Overview
- Mikro orders
- BOMs
- Production orders
- Floor entry
- Mikro transfer
- Design
- Cutting
- Welding
- Painting
- Assembly
- Design
- Cutting
- Welding
- Painting
- Assembly
- Design
- Cutting
- Welding
- Painting
- Assembly
- Design
- Cutting
- Welding
- Painting
- Assembly
Project managerEach item of the project passes through its phase route; from design to assembly you can see where every part is.
Every item of the project and its phase on one screen, so due-date risk shows early.
Representative screen prepared with sample data.
- Dashboard
- Planning
- Floor
- Quality
- Traceability
- Costing
- Mikro
- Batch
- PR-26-0312
- Order
- SP-26-1190
- Produced
- 12.10.2026
- Best before
- 12.10.2028
- Carton
- 4 / 120
- Batch PR-26-0312 · 1,200 kgReactor R2 · 12.10.2026 08:10–13:45Approved
- Titanium dioxide · L-0914264.2 kg · supplier: Sample ChemicalsIncoming check ✓
- Acrylic binder · L-0877425.6 kg · supplier: North PolymersIncoming check ✓
- Calcite filler · L-0931216.0 kgIncoming check ✓
- Additive pack · L-094030.0 kgIncoming check ✓
- Packaging · 2.5 L pail · L-1102480 pcsIncoming check ✓
- Shipment · DN-26-5521Sample DIY Store · 120 cartonsShipped
- Dealer warehouse · Ankara48 cartonsReceived
QualityFinished goods labels are printed with batch, order and barcode; from the label you trace back which raw material lots were used.
For a complaint, you get from the label barcode to the raw material lot, and to other shipments with the same lot, in minutes.
Representative screen prepared with sample data.
- Dashboard
- Planning
- Floor
- Quality
- Traceability
- Costing
- Mikro
| Item | Planned | Actual | Forecast to go | Status |
|---|---|---|---|---|
| Sections and plate | ₺2.640.000 | ₺2.210.300 | ₺468.000 | On target |
| Bolts and fixings | ₺186.000 | ₺171.200 | ₺22.000 | On target |
| Welding consumables | ₺94.000 | ₺102.600 | ₺18.000 | 28% over |
| Scrap | ₺52.000 | ₺71.400 | ₺9.000 | 55% over |
| Labour · cutting | ₺210.000 | ₺168.000 | ₺40.000 | On target |
| Labour · welding | ₺520.000 | ₺446.900 | ₺118.000 | 8% over |
| Subcontract · painting | ₺380.000 | ₺248.000 | ₺124.000 | On target |
| Assembly and transport | ₺730.000 | ₺550.000 | ₺210.000 | 4% over |
Management and financePlanned cost from the BOM next to actual material, scrap, labour and subcontracting cost, per order or project.
Overruns show per item before the project ends, and the next quote is priced on actual data.
Representative screen prepared with sample data.
- Overview
- Mikro orders
- BOMs
- Production orders
- Floor entry
- Mikro transfer
| Record | Direction | Count | Time | Status |
|---|---|---|---|---|
| Sales orders | Mikro → Nitrogen | 42 | 10:30 | Done |
| Stock items | Mikro → Nitrogen | 3.214 | 10:30 | Done |
| Consumption documents | Nitrogen → Mikro | 9 | 10:24 | Sent |
| Production receipts | Nitrogen → Mikro | 9 | 10:24 | 1 error · stock item inactive |
| Accounts | Mikro → Nitrogen | 1.186 | 10:30 | Done |
| Warehouses | Mikro → Nitrogen | 6 | 10:30 | Done |
| Scrap documents | Nitrogen → Mikro | 4 | 10:24 | Sent |
| Warehouse transfers | Nitrogen → Mikro | 7 | 10:18 | Sent |
| Order status updates | Nitrogen → Mikro | 23 | 10:18 | Sent |
| Production receipts | Nitrogen → Mikro | 6 | 09:52 | Sent |
FinanceOrders come from Mikro; actual consumption and finished goods go back to Mikro as documents.
Consumption and finished goods are not keyed into Mikro by hand; stock and cost are current every day.
Representative screen prepared with sample data.
Before and after
Today's way versus Nitrogen UTS
| Topic | Today | Nitrogen UTS |
|---|---|---|
| Production records | Paper forms, keyed in at day end | From the station, posted to Mikro at once |
| Work-order status | Walk the floor and ask | Live monitoring screen |
| Set and station order | Jobs with missing parts can reach assembly or packing | A station never takes a job before the previous step is done |
| Bottlenecks | Noticed once shipping is late | Live, with waiting time per station |
| Downtime | Reason and length unknown | Logged with a reason and reported |
| Material consumption | Estimated at month end | Actual consumption per work order |
| Costing | Stays at the pre-cost | Compared with actual cost |
Integration
Integration and platform
- Fully integrated with Mikro Jump and Mikro Fly, with instant data transfer
- Web-based: kiosk screens, handhelds and tablets
- Scale and counting-scale integration
- Works with Nitrogen PDA (warehouse) and Nitrogen QMS (quality)
- Advanced permissions and parametric setup
- A platform open to project-specific development
Rollout
From setup to go-live
- Discovery and analysisWe review your processes on site or remotely and clarify requirements.
- Setup and configurationWe connect the application to Mikro ERP and define parameters for your business.
- TrainingWe deliver role-based training to users and managers.
- Go-live and supportWe go live together and continue with ongoing support.
Hardware
Hardware solutions for your production floor
Station devices matter as much as the software. We plan kiosks, tablets, handhelds, scales, barcode printers and scanners from the brands we work with, together with your production processes.
Kiosks and touch panels
Starting jobs · Output entry · Scrap and downtime
Use touch kiosks and panel PCs at production stations so operators can start work orders and record output, scrap and downtime. Choose the screen size and mounting to suit your working environment.
Chosen per project by screen size and mounting
Tablets
Plan tracking · Work orders · Shift control
Follow the production plan, work orders and station status on a larger screen on the floor. Choose tablets for shift supervisors and foremen according to where they will be used.
Handheld terminals
Material issue · Output receipt · Traceability
Scan barcodes with handheld terminals when issuing materials to production, receiving semi-finished and finished goods and reading labels, so traceability records are created on the floor.
Weighbridges and scales
Material weighing · Count by weight · Output weighing
Plan scales and weighbridges together with your stations for weighing materials by recipe, counting pieces by weight and recording output weight. Choose options that suit the capacity and precision you need.
Wired and wireless barcode scanners
Work order scans · Label checks · Station
Consider wired or wireless scanners for reading work order, product and label barcodes at stations. Pick the device for the reading distance and connection you need.
Desktop barcode printers
Output labels · Batch labels · Carton labels
Prepare semi-finished, finished, batch and carton labels next to the production point. Choose options that suit your print volume, label size and material.

- Kodprint
Industrial barcode printers
End of line · Packing · Pallet labels
For busy production lines, end-of-line and packing points, choose industrial printers that suit your print volume and conditions.
Mobile Bluetooth printers
On-the-spot labels · Buffer stock · Dispatch point
Print labels where the work is done: on the line, in buffer areas or at the dispatch point. Consider the device connection and print type together.
Android 10 or later is recommended for handhelds and tablets.
Let's choose the right hardware for your production floor together
Tell us how many stations you have, the device groups you want to use and your label needs; we will assess the hardware together with your production flow.
Brands show the options we work with in each product group; model and application compatibility is assessed separately for your needs.
Screenshots
Nitrogen UTS screens
Production dashboard: progress by plant and station, bottlenecks
Production tracking: route by order, set and line
Station queue: fabric cutting
Order set detail: start, work order and label
Station queue: assembly, days overdue
Assembly staff assignment and workload per person
Shipping: package counts, labels and handover to carrier
Production definitions: plants, stations, routes and staff
Operation control panel: start, output entry, stop and label
Operator screen: planned, active and stopped work orders
Production completion and output entry
Barcode-driven production: adding to cartons and printing labels
Mobile production report: output, machine waiting time and scrap
Station monitor
Machine monitor
Operator screen
Planning
Work-order tracking
Reservations
Subcontracting
Counting scale
Frequently asked questions
Meet Nitrogen UTS: a live demo with your own data
In a 30-minute live demo we walk through your process and share the right setup and quote the same day.